Projects
Title | Docket No | Description |
---|---|---|
Lemon Hill Solar Project | 25-126 | Lemon Hill Solar, LLC is proposing to construct an up to 180-megawatt solar energy generating facility in Olmsted County, Minnesota. |
Elm Creek II Wind Project | 09-553 | Heartland Wind, LLC, LWECS Site Permit Application for a 150 MW Wind Farm in Jackson and Martin Counties |
Blue Lake Battery Energy Storage Project | 25-214 | Xcel Energy proposes to construct and operate a battery energy storage system with a nominal power rating of up to 135.5 megawatts (MW) alternating current with approximately 542 megawatt-hours of energy capacity on a site consisting of approximately 70 acres adjacent to Xcel Energy's existing Blue Lake Peaking Plant in the City of Shakopee, Scott County, Minnesota |
Lake Charlotte Solar Project | 25-205 | Lake Charlotte, LLC proposes to construct the 150 MW Lake Charlotte Solar Facility and 150 MW / 600-megawatt hour (MWh) Battery Energy Storage System (BESS) in Rutland Township, Martin County, Minnesota. |
Bent Tree North Wind Farm | 24-349 | Wisconsin Power and Light Company is proposing to construct the Bent Tree North Wind Farm, an up to 153 megawatt (MW) wind farm in Freeborn, Waseca, and Steele County. |
Lyon County Generating Station Project | 25-145 | Northern States Power Company, a Minnesota corporation doing business as Xcel Energy, has submitted a Combined Application to the Minnesota Public Utilities Commission (Commission) for the proposed Lyon County Generating Station Project. This application seeks multiple approvals, including a Certificate of Need, Site Permit, Transmission Line Route Permit, and Pipeline Routing Permit, as well as a Partial Exemption for routing the pipeline. |
Crane and Sandhill Battery Energy Storage Projects | 24-406 | Crane Energy Storage LLC and Sandhill Energy Storage LLC propose to construct and operate two 200 MW/800 MWh battery energy storage systems (BESS) and ancillary support infrastructure in Olmsted County, Minnesota. |
North Star Battery Energy Storage Project | 25-123 | North Star Energy Storage, LLC, proposes to construct the North Star Battery Energy Storage Project in the City of North Branch in Chisago County, MN. |
Summit Lake Solar Project | 25-88 | Summit Lake proposes to construct the Summit Lake Solar Facility and Battery Energy Storage System, collectively the Project, in Summit Lake and Elk Townships, Nobles County, Minnesota. The Solar Facility is proposed as a solar energy conversion facility with a 200-megawatt (MW) alternating current (AC) nameplate capacity. The associated BESS will consist of a stand-alone structure with a 200 MW / 800-megawatt hour (MWh) nameplate capacity and ancillary support infrastructure. The BESS will be constructed directly adjacent to the collector substation for the Solar Facility. |
Castle Rock Solar Project | 24-267 | Castle Rock Solar, LLC is proposing to construct an up to 150-megawatt solar energy generating facility in Dakota County, Minnesota. |
Boswell Solar Project | 24-425 | Minnesota Power proposes to construct and operate an up to 85-megawatt (MW) photovoltaic (PV) solar energy generating facility and an associated 2.45 mile 230 kilovolt (kV) transmission line (Gen-Tie Line) in Itasca County, Minnesota. |
Appleton to Benson 115 kV Transmission Line Project | 24-263 | The applicants propose to upgrade and construct approximately 29 miles of 115 kV transmission line in Swift County, Minnesota. |
Midwater Energy Storage Project | 24-294 | Midwater BESS, LLC, a subsidiary of Spearmint Renewable Development Company, LLC, plans to build and operate a 150-megawatt battery energy storage system (BESS) and a 2,668-foot long 161 kV high voltage transmission line (HVTL) in Shell Rock Township, Freeborn County, Minnesota. The project, called the Midwater Energy Storage Project, will interconnect the BESS to the grid. Construction is expected to start in the first quarter of 2027, with commercial operations set for the end of 2027. |
Solway Solar Project | 24-309 | Otter Tail Power Company is proposing to construct an up to 66 megawatt photovoltaic solar energy generating facility in Beltrami County, Minnesota. |
Snowshoe Energy Storage Project | 24-279 | Snowshoe BESS, LLC proposes to construct and operate a battery energy storage system (BESS) with a nominal power rating of up to 150 megawatts (MW) alternating current (AC) with approximately 600 megawatt-hours (MWh) of energy capacity on a site of approximately 28 acres in Kalmar Township, Olmsted County, Minnesota. |
Big Stone South to Alexandria 345 kV Transmission Line Project | 23-160 | The Applicants propose to construct over 90 miles of new transmission line from Big Stone South, South Dakota to Alexandria, Minnesota along portions of Big Stone, Swift, Stevens, Pope, and Douglas Counties. New transmission lines will be required to connect the existing substations in Big Stone South and Alexandria. Both of the existing substations would also require minor expansions. A new fiber optic Regeneration Station would also be needed within the central segment of the project on 0.23 acres of land. |
Forks-Rost 161 kV Transmission Line Project | 24-232 | The Forks-Rost project will include construction of the new Forks Switching Station southwest of the City of Lakefield, in Jackson County, Minnesota, and a new, approximately 8.5 mile long, 161 kV high voltage transmission line. ITC indicates this project is needed to mitigate existing system low voltage issues and to help ensure long term area reliability when considering existing load and potential future area load growth. |
Beaver Creek Transmission Line Project | 24-95 | Dairyland Power Cooperative (Dairyland) is proposing to construct an approximately 3.5 mile 161 kilovolt (kV) high voltage transmission line and associated facilities on a new right-of-way in York Township in Fillmore County, Minnesota. |
Northern Crescent Solar Facility and Energy Storage System | 22-57 | Proposed 150 megawatt (MW) solar energy generation facility and 50 MW energy storage facility in Faribault County, Minnesota. |
Northern Crescent Solar Facility and Energy Storage System | 24-238 | Proposed 150 megawatt (MW) solar energy generation facility and 50 MW energy storage facility in Faribault County, Minnesota. |
Coneflower Solar Project | 24-215 | Coneflower Energy, LLC is proposing to construct an up to 235-megawatt solar energy generating facility in Lyon County, Minnesota. |
Benton Solar Project | 23-423 | Benton Solar, LLC proposes to construct a 100 megawatt (MW) solar energy generating facility, a 100 MW battery energy storage system, and a 0.4 mile long, 115 kilovolt high voltage transmission line within Minden Township, Benton County, Minnesota. |
Birch Coulee Solar Project | 23-477 | Birch Coulee Solar, LLC is proposing to construct an up to 125-megawatt photovoltaic solar energy generating facility in Renville County, Minnesota. |
Laketown 115 kV Transmission Line Project | 24-132 | Great River Energy proposes to construct a new 4.3 mile long 115 kV transmission line in Laketown and Dahlgren Townships in Carver County. |
Mankato to Mississippi River Transmission Project | 23-157 | Proposed construction and operation of approximately 130 miles of 345 kV transmission line from the Wilmarth Substation in Mankato, MN to the Mississippi River near Kellogg, MN. The project will also include the construction of new 161 kV transmission line, approximately 20 miles long from the existing North Rochester Substation near Pine Island, Minnesota to a connection point with an existing 161 kV Chester transmission line northeast of Rochester, Minnesota. |
Wabasha 161 kV Relocation Project | 23-388 | Dairyland Power Cooperative has submitted a joint Certificate of Need and Route Permit Application to the Minnesota Public Utilities Commission to relocate approximately 13.3 miles of 161-kilovolt (kV) high voltage transmission line (HVTL) and construct a new substation in Wabasha County, Minnesota. |
Gopher State Solar | 24-106 | Gopher State Solar, LLC is proposing to construct a new 200 mW solar energy generating facility in Renville County, Minnesota. |
Iron Pine Solar Project | 23-414 | Iron Pine Solar Power, LLC is proposing an up to 325-megawatt photovoltaic solar energy generating system and a 230-kilovolt high voltage transmission line in Kettle River Township, Pine County, Minnesota. |
Prairie Island Nuclear Plant Additional Spent Fuel Storage | 24-68 | Xcel Energy is proposing additional dry cask storage of spent nuclear fuel at the Prairie Island nuclear plant. The additional storage would allow continued operation of the plant until 2054. |
Plummer Solar Project | 22-451 | Enbridge Solar (Plummer), LLC is proposing to construct an up to 130 MW solar energy generating system located in Emardville Township in Red Lake County, Minnesota. |
Pilot Knob to Burnsville Rebuild and Upgrade Project | 23-410 | The Commission issued a route permit to Great River Energy to rebuild an existing 69 kV transmission line in Eagan and Burnsville as 115 kV transmission line. |
Dooley's Renewable Natural Gas Pipeline | 23-392 | Dooley's Natural Gas II, LLC (Dooley's) is proposing to construct approximately 28 miles of 4-inch and 2-inch pipeline in Chippewa, Swift, and Kandiyohi Counties |
Northland Reliability 345 kV Transmission Line Project | 22-415 | Minnesota Power and Great River Energy propose to construct approximately 140 miles of new double-circuit 345 kV transmission line and to replace approximately 40 miles of existing transmission line with double-circuit 345 kV transmission line. The project would connect the existing Iron Range substation, near Grand Rapids, Minn., to a new Big Oaks substation near Monticello, Minn. |
Alexandria to Big Oaks 345 kV Transmission Line Project | 23-159 | Xcel Energy proposes to string approximately 105-108 miles of new transmission line on existing double-circuit capable structures running from the existing Alexandria Substation in Alexandria, Minnesota to Becker, Minnesota, where new transmission lines would be needed to cross the Mississippi River and facilitate the new Big Oaks Substation. |
Xcel Energy's Sherco 3 Solar Project | 23-217 | Xcel Energy proposes to construct a new 250 MW solar energy project in Sherburne County, Minnesota |
Cedar Lake 115 kV HVTL Reroute Project | 23-170 | Great River Energy proposes to construct a new 6.3 mile long 115 kV transmission line in Rice County and Scott County. |
Minnesota Power HVDC Modernization Project | 22-611 | To modernize the Minnesota terminal of the existing Square Butte high voltage direct current (HVDC) line that runs from North Dakota to Northeast Minnesota, a new terminal, new substation, and three high voltage transmission lines are proposed on a new site near the existing Arrowhead Substation in St. Louis County, Minnesota. |
Pipestone Pipeline Reroute Project | 23-109 | The Magellan Pipeline Company proposes to relocate approximately 0.74 miles of an existing petroleum pipeline in Pipestone County. |
Cambridge Station Unit 2 Combustion Turbine Fuel Conversion Project | 22-122 | The project would replace existing natural gas burners with dual-fuel burners and install associated facilities to allow ULSD fuel oil combustion during periods of natural gas curtailment. The project is expected to protect GRE customers from extremely high energy prices. |
Minnesota Energy Connection | 22-132 | Xcel Energy has applied for a certificate of need to construct two approximately 160- to 180-mile 345 kilovolt transmission lines and associated facilities connecting the Sherburne County Generation Station Substation (Sherco Substation) in Becker, Minnesota, and a new substation in Lyon County, Minnesota. |
Heartland Corn Products Natural Gas Pipeline Project | 23-43 | Heartland Corn Products proposes to construct an approximately 7.78-mile long, 6.625-inch outside diameter natural gas pipeline in Sibley County, Minnesota. The pipeline will originate near 595th Avenue, north of Highway MN- 19 (west of the City of Winthrop) and tie into the Hutchinson Utilities Commission pipeline at a new interconnect station. |
Lake Wilson Solar Energy Center | 21-792 | Lake Wilson Solar Energy proposes to construct and operate Lake Wilson Solar Energy Center, an up to 150 megawatt alternating current photovoltaic solar energy generating facility with 95 megawatts of battery storage in Leeds Township, Murray County, Minnesota. |
Otter Tail to Wilkin Carbon Dioxide Pipeline Project | 22-422 | Summit Carbon Solutions, LLC, proposes to construct about 30 miles of carbon dioxide pipeline through Otter Tail and Wilkin Counties. |
St. Joseph 115-kV Transmission Line and Substation Upgrade | 22-235 | Great River Energy proposes to replace and upgrade 3.2 miles of existing 69-kV transmission line with 115-kV transmission line in St. Joseph, MN. Two existing substations along the route will be modified to accommodate the upgrade. |
Pleasant Valley Wind Project Repower | 09-1197 | The proposed repowering of the Pleasant Valley Wind Project will consist of upgrading the existing 100 Vestas V100 turbines with Vestas V110, 2.2 MW turbines. Existing wind turbine towers will remain in place and be used for the installation of the new Vestas V110 turbines. Repowering of 86 of 100 existing turbines will involve the replacement of some components of the existing turbine nacelles and installing rotors with longer blades. The remaining 14 turbines will be repowered by replacing the entire turbine nacelle and a rotor with longer blades. New, larger turbine blades, coupled with upgraded generators will result in an increase of nominal production capacity of the Pleasant Valley Wind Project from 200 MW to 220 MW. |
Rochester Airport Pipeline Relocation Project | 21-266 | BP Midwest Product Pipelines Holding, LLC (BPMW) is proposing to reroute a section of pipeline near the Rochester International Airport in Olmsted County, Minnesota. |
Rose Creek Wind Project | 21-643 | The Rose Wind Project is currently operating and consists of 11 turbines that were previously permitted by Mower County, under seven separate limited liability companies. The Rose Wind Project will be repowered, renamed the Rose Creek Wind Project and operate under one company. Once repowered, the Rose Creek Wind Project will consist of six or seven wind turbines, and have a nameplate capacity of 17.4 MW. |
Duluth Loop Reliability Project | 21-141 | On October 21, 2021, Minnesota Power (Applicant) submitted a Certificate of Need (CN) Application and a high voltage transmission line (HVTL) Route Permit Application (RPA) to the Minnesota Public Utilities Commission (Commission). The RPA is submitted under the alternative review process (Minnesota Statute 216E.04; Minnesota Rule 7850.2800-3900). |
Monticello Nuclear Plant Additional Spent Fuel Storage | 21-668 | Xcel Energy is proposing additional dry cask storage of spent nuclear fuel at the Monticello nuclear plant. The additional storage would allow continued operation of the plant until 2040. |
Byron Solar Project | 20-763 | Byron Solar, LLC is proposing to build a 200 MW solar project in Dodge County Minnesota. The Byron Solar Project would connect to the electrical grid via approximately three to four and one-half miles of newly constructed 345 kV transmission line. |