Hayward Solar Project | 21-113 | Hayward Solar, LLC is proposing to build and operate a 150 MW solar farm in Freeborn County. |
Xcel Energy Sherco Solar Project | 21-189 | Northern States Power Company, doing business as Xcel Energy is proposing to construct an up to 460-megawatt solar project and two 345 kilovolt transmission lines to interconnect the Solar Project to the\r\ngrid. As proposed, the West high voltage transmission line (HVTL) is approximately 3.2 miles long and the East HVTL line is approximately 1.7 miles long; both HVTL lines connect the Solar Project to the existing\r\nSherburne County Substation. The Solar Project will partially replace energy production of the Sherco Generating Plant Unit 2, currently a coal-powered facility, which will cease operations in 2023. |
Pine Bend Pipeline Project | 20-872 | Petroleum Fuels Company (PFC) is proposing to construct a 5,600 foot long natural gas pipeline in Dakota County. The pipeline will transport natural gas from a processing facility near the Pine Bend landfill to an interconnection with the Northern States Power gas system. |
Red Rock Solar Project | 19-620 | Red Rock Solar, LLC, a subsidiary of Apex Clean Energy, LLC, has proposed to construct and operate the Red Rock Solar Project in Cottonwood County, Minnesota. The proposed Red Rock Solar Project would generate up to 60 megawatts (MWs), and the anticipated project size is 483 acres. |
Big Bend Wind 161 kV Transmission Line | 19-621 | Big Bend Wind, LLC has proposed the construction and operation of an 18 mile long 161 kilovolt (kV) high voltage transmission line (HVTL) to be located in Cottonwood, Martin, and Watonwan Counties, Minnesota. The proposed 161 kV HVTL is proposed to begin at the Big Bend Wind Project substation, and extend 18 miles to a proposed step-up substation to be located less than 1,500 feet of the Crandell Switching Station. |
Big Bend Wind Project | 19-619 | Big Bend Wind, LLC, a subsidiary of Apex Clean Energy, Inc., is proposing the Big Bend Wind Project located within portions of Cottonwood and Watonwan counties, Minnesota. The Big Bend Wind Project is proposing to constructed and operate 47 Nordex N-163 (5.7 MW), 48 Vestas V162 (5.6 MW), or 49 GE-158 (5.5 MW) turbines, which will have a total generation capability of up to 308 megawatts (MWs). \r\n\r\n |
Plum Creek Wind Farm and Associated 345 kV Transmission Line Project | 18-700 | Plum Creek Wind Farm, LLC proposes to construct a 414 megawatt (MW) wind farm and associated 345 kV transmission line in Cottonwood, Murray, and Redwood County, Minnesota. |
Plum Creek Wind Farm 345 kV Transmission Line | 18-701 | Plum Creek Wind Farm, LLC proposes to construct a 414 megawatt (MW) wind farm and associated transmission line in Cottonwood, Murray, and Redwood County, Minnesota. The transmission line is proposed to be a 345 kilovolt (kV) line, with a length of approximately 31 miles. |
Three Waters Wind Farm | 19-576 | Three Waters Wind Farm, LLC is proposing the 201 MW Three Waters Wind Farm in Jackson County, Minnesota. The proposed project area also extends into Osceola and Dickinson Counties, Iowa. The proposed project is primarily planned to be located within Jackson County, Minnesota, but project areas within Osceola and/or Dickinson Counties, Iowa may be utilized as alternative locations should they be necessary. Three Waters Wind Farm, LLC has also applied for a Certificate of Need (CN), which can be found under docket #IP-7002/CN-19-154. |
Elk Creek Solar Project | 19-495 | On September 16, 2019, Geronimo Energy submitted a site permit application to the Minnesota Public Utilities Commission (Commission) under the alternative review process (Minnesota Statute 216E.04; Minnesota Rule 7850.2800-3900). Geronimo Energy proposes to construct the Elk Creek Solar Project (Project), a solar energy conversion facility with an 80-megawatt (MW) alternating current (AC) nameplate capacity, in Vienna Township, Rock County, Minnesota. |
Regal Solar Project | 19-395 | Regal Solar, LLC was granted a site permit to construct the 100 MW Regal Solar Project in Benton County. |
Enbridge Energy, Limited Partnership: Fond du Lac Line 4 Project | 18-752 | Enbridge Energy, Limited Partnership has applied for a Pipeline Route Permit and Partial Exemption for the Fond du Lac Line 4 Project on the Fond du Lac Band of Lake Superior Chippewa Reservation. The Project will relocate approximately 10 miles of the existing Line 4 pipeline from the center to the outer edge of the existing Enbridge Mainline Corridor within the Fond du Lac Band Reservation. |
Dodge County Wind 161 kV Transmission Line | 20-867 | Dodge County Wind proposes to construct approximately 27 miles of 161 kV transmission line in Dodge and Mower counties in Minnesota. |
Dodge County Wind Project | 20-866 | Dodge County Wind, LLC (DCW or applicant), a subsidiary of NextEra Energy Resources, LLC, proposes to construct and operate a 259-megawatt (MW) wind farm in Dodge and Steele Counties and an associated 161 kV transmission line in Dodge and Mower counties. |
Blazing Star 2 Wind Project | 17-700 | Blazing Star 2 Wind Project is a 200 MW LWECS planned for construction in Lincoln County |
Freeborn Wind Farm | 17-410 | Freeborn Wind Energy, LLC, an affiliate of Invenergy, LLC, has proposed to construct and operate the 200 MW Freeborn Wind Farm in Freeborn County, Minnesota and Worth County, Iowa |
Rochester Natural Gas Pipeline Project | 15-858 | Minnesota Energy Resources Corporation is proposing to install approximately 13.1 miles of new natural gas pipeline west and south of the city of Rochester in Olmsted County, Minnesota |
Line 3 Pipeline Replacement | 15-137 | Enbridge Energy proposes to replace 337 miles of the Line 3 Pipeline in Minnesota. Line 3 originates in Canada, continues through North Dakota, enters Minnesota in Kittson County, and terminates in Superior, Wiscsonsin. |
GRE and MP Savanna HVTL Project | 10-1307 | The Savanna HVTL Project is a proposal by Great River Energy and Minnesota Power for new switching station and rebiuld of an existing 69 kV line to a 115 kV HVTL in St. Louis and Carlton Counties |
Brookings County - Hampton Transmission Line Project | 08-1474 | A 237-mile 345 kilovolt (kV) transmission line and associated facilities running from Brookings County, South Dakota, to Hampton, Minnesota. The project began operation in 2015. |
Prairie Island Nuclear Plant Spent Fuel Storage | 08-510 | Xcel Energy is proposing a change in spent fuel storage technology at the Prairie Island ISFSI. |