Sherco Solar 4 and Associated 345 kV Transmission Line Project

Project Details

Docket Numbers
Project Name
Sherco Solar 4 and Associated 345 kV Transmission Line Project
Applicant
Xcel Energy
Location
Sherburne County
Description

Xcel Energy proposes to construct and operate the Sherco Solar 4 Project, an up to 200 megawatt (MW) solar energy generating system and approximately 2.7 miles of single-circuit transmission line in Sherburne County.

Status
active

Project Contact

Contact
Suzanne Steinhauer
Phone

Project Summary

Xcel Energy proposes to construct and operate the Sherco Solar 4 Project, an up to 200 megawatt (MW) solar energy generating system and associated facilities (Solar Facility) in Palmer, Haven, and Clear Lake townships in Sherburne County. Xcel also proposes to construct and operate approximately 2.7 miles of single circuit 345 kV transmission line, a new switching station, and two short (approximately 250-foot long) tap lines (Transmission Facility) in Clear Lake Township to connect the Solar Facility to the transmission grid along the future Minnesota Energy Connect transmission line. 

Interactive Map

Key Project Documents

Date
Title
Description
09/01/2026
Sherco 4 Project Joint Application for a Site Permit and Route Permit and Environmental Assessment