Lyon County Generating Station Project

Project Details

Docket Numbers
Project Name
Lyon County Generating Station Project
Applicant
Northern States Power DBA Xcel Energy
Location
Lyon County
Description

Northern States Power Company, a Minnesota corporation doing business as Xcel Energy, has submitted a Combined Application to the Minnesota Public Utilities Commission (Commission) for the proposed Lyon County Generating Station Project. This application seeks multiple approvals, including a Certificate of Need, Site Permit, Transmission Line Route Permit, and Pipeline Routing Permit, as well as a Partial Exemption for routing the pipeline.
 

Status
active

Project Contact

Contact
James E. Sullivan
Phone

Project Summary

The Project includes three major components:

  1. Generation Project: This involves the construction and operation of two combustion turbines (CTs), each with a capacity of approximately 210 megawatts (MW). These turbines will be located on-site with supporting infrastructure such as operation facilities, a water bath heater, emergency diesel fire pump, and diesel backup generators. Together, they form the Generation Project, which requires a Certificate of Need and a Site Permit.
     
  2. Transmission Lines: The project includes two short transmission line connections that will link the generation site to the regional grid. These lines are essential to transfer electricity from the turbines to the broader network. Approval is sought under the Commission’s alternative permitting process for these lines.
     
  3. Natural Gas Pipeline: A key component of the project is a 965-foot natural gas pipeline. This pipeline includes approximately 700 feet of 12-inch diameter pipe and two branches of 8-inch pipe, each connecting to a combustion turbine. It will operate at around 550 psig and connect to an existing Applicant gas line. Due to its limited scale and potential impact, Xcel Energy is requesting a partial exemption from the standard pipeline routing procedures as per Minnesota Rules Chapter 7852.0700.

These elements together constitute the full Lyon County Generating Station Project. The entire facility will be located on two parcels in Lyon County, Minnesota, adjacent to the proposed Garvin Substation. The site was chosen to align with the southern terminus of the Minnesota Energy Connection Project (MNEC), an infrastructure initiative featuring a 345-kilovolt (kV), 180-mile double-circuit transmission line connecting the Sherburne County Generation Station Substation in Becker to the Garvin Substation. The Project’s successful operation is dependent on the completion and energization of the MNEC.

The Project footprint covers about 155 acres, but permanent development and environmental impact will be limited to approximately 30 acres. Xcel Energy will own the parcels on which the Project will be constructed, ensuring control over land use and compliance with operational and environmental standards. The proposal aligns with ongoing energy transition efforts and broader state planning for future electrical grid needs. od.

Interactive Map

Key Project Documents

Date Title Description
05/09/2025 Lyon County Generation Project - Combined Application Northern States Power Company, a Minnesota corporation doing business as Xcel Energy, has submitted a Combined Application to the Minnesota Public Utilities Commission (Commission) for the proposed Lyon County Generating Station Project. This application seeks multiple approvals, including a Certificate of Need, Site Permit, Transmission Line Route Permit, and Pipeline Routing Permit, as well as a Partial Exemption for routing the pipeline.

Docket Documents

View All Project Documents 

Date Document ID On Behalf Of Description
May 8, 2026 20265-231630-01 PUC
April 29, 2026 20264-231144-01 PUC April 30, 2026 Agenda, New Decision Option 10 (A) - Commissioner Tuma
April 28, 2026 20264-231096-01 PUC April 30, 2026 Agenda, Staff New Decision Options 3.e-h
April 22, 2026 20264-230789-01 PUC April 30, 2026 Agenda
April 17, 2026 20264-230499-01 PUC April 30, 2026 Agenda
April 16, 2026 20264-230922-01 PUC John Biren
April 16, 2026 20264-230624-01 PUC Lyon County
April 13, 2026 20264-230349-01 LIUNA Minnesota/North Dakota
April 13, 2026 20264-230339-01 OAG-RUD Filing Letter
April 13, 2026 20264-230339-02 OAG-RUD
April 13, 2026 20264-230322-01 PUC EIP Report - Lyon County Generating Station
April 7, 2026 20264-230083-01 Xcel Energy
March 30, 2026 20263-229767-01 CAH Findings of Fact, Conclusions of Law and Recommendations
March 24, 2026 20263-229600-01 PUC EIP Revision to EA Appendices - Addresses order of appendices
February 26, 2026 20262-228719-01 PUC EIP EIP Reply Comments
February 23, 2026 20262-228580-01 PUC IBEW
February 23, 2026 20262-228506-01 OAG-RUD Filing Letter
February 23, 2026 20262-228506-02 OAG-RUD
February 20, 2026 20262-228410-04 Xcel Energy Attachment A to Proposed Findings of Fact
February 20, 2026 20262-228410-02 Xcel Energy Proposed Findings of Fact, Conclusions of Law, and Recommendations
February 20, 2026 20262-228410-01 Xcel Energy Response to Hearing Comments
February 18, 2026 20262-228306-01 Xcel Energy Reply Comments in Support of Certificate of Need
February 12, 2026 20262-228094-01 LIUNA Minnesota/North Dakota
February 12, 2026 20262-228104-01 PUC EIP MPCA Comments on the EA
February 12, 2026 20262-228103-01 PUC EIP EPA Region 5 Comments on Air Quality Modeling and Permitting for the EA
February 11, 2026 20262-228077-01 OAG-RUD Filing Letter
February 11, 2026 20262-228077-02 OAG-RUD
February 11, 2026 20262-228072-01 DOC DER
February 11, 2026 20262-228063-01 Xcel Energy 2026-02-11 Lyon County_Comments on EA and Sample Permits
February 9, 2026 20262-227950-01 PUC Ian Hedberg