Lyon County Generating Station Project
Project Details
Northern States Power Company, a Minnesota corporation doing business as Xcel Energy, has submitted a Combined Application to the Minnesota Public Utilities Commission (Commission) for the proposed Lyon County Generating Station Project. This application seeks multiple approvals, including a Certificate of Need, Site Permit, Transmission Line Route Permit, and Pipeline Routing Permit, as well as a Partial Exemption for routing the pipeline.
Project Contact
Project Summary
The Project includes three major components:
- Generation Project: This involves the construction and operation of two combustion turbines (CTs), each with a capacity of approximately 210 megawatts (MW). These turbines will be located on-site with supporting infrastructure such as operation facilities, a water bath heater, emergency diesel fire pump, and diesel backup generators. Together, they form the Generation Project, which requires a Certificate of Need and a Site Permit.
- Transmission Lines: The project includes two short transmission line connections that will link the generation site to the regional grid. These lines are essential to transfer electricity from the turbines to the broader network. Approval is sought under the Commission’s alternative permitting process for these lines.
- Natural Gas Pipeline: A key component of the project is a 965-foot natural gas pipeline. This pipeline includes approximately 700 feet of 12-inch diameter pipe and two branches of 8-inch pipe, each connecting to a combustion turbine. It will operate at around 550 psig and connect to an existing Applicant gas line. Due to its limited scale and potential impact, Xcel Energy is requesting a partial exemption from the standard pipeline routing procedures as per Minnesota Rules Chapter 7852.0700.
These elements together constitute the full Lyon County Generating Station Project. The entire facility will be located on two parcels in Lyon County, Minnesota, adjacent to the proposed Garvin Substation. The site was chosen to align with the southern terminus of the Minnesota Energy Connection Project (MNEC), an infrastructure initiative featuring a 345-kilovolt (kV), 180-mile double-circuit transmission line connecting the Sherburne County Generation Station Substation in Becker to the Garvin Substation. The Project’s successful operation is dependent on the completion and energization of the MNEC.
The Project footprint covers about 155 acres, but permanent development and environmental impact will be limited to approximately 30 acres. Xcel Energy will own the parcels on which the Project will be constructed, ensuring control over land use and compliance with operational and environmental standards. The proposal aligns with ongoing energy transition efforts and broader state planning for future electrical grid needs. od.
Interactive Map
Key Project Documents
| Date | Title | Description |
|---|---|---|
| 05/09/2025 | Lyon County Generation Project - Combined Application | Northern States Power Company, a Minnesota corporation doing business as Xcel Energy, has submitted a Combined Application to the Minnesota Public Utilities Commission (Commission) for the proposed Lyon County Generating Station Project. This application seeks multiple approvals, including a Certificate of Need, Site Permit, Transmission Line Route Permit, and Pipeline Routing Permit, as well as a Partial Exemption for routing the pipeline. |
Docket Documents
View Project Documents (last 30) View All Project Documents
| Date | Document ID | On Behalf Of | Description |
|---|---|---|---|
| February 23, 2026 | 20262-228506-01 | OAG-RUD | Filing Letter |
| February 23, 2026 | 20262-228506-02 | OAG-RUD | |
| February 20, 2026 | 20262-228410-01 | Xcel Energy | Response to Hearing Comments |
| February 20, 2026 | 20262-228410-02 | Xcel Energy | Proposed Findings of Fact, Conclusions of Law, and Recommendations |
| February 20, 2026 | 20262-228410-04 | Xcel Energy | Attachment A to Proposed Findings of Fact |
| February 18, 2026 | 20262-228306-01 | Xcel Energy | Reply Comments in Support of Certificate of Need |
| February 12, 2026 | 20262-228104-01 | PUC EIP | MPCA Comments on the EA |
| February 12, 2026 | 20262-228103-01 | PUC EIP | EPA Region 5 Comments on Air Quality Modeling and Permitting for the EA |
| February 12, 2026 | 20262-228094-01 | LIUNA Minnesota/North Dakota | |
| February 11, 2026 | 20262-228077-02 | OAG-RUD | |
| February 11, 2026 | 20262-228077-01 | OAG-RUD | Filing Letter |
| February 11, 2026 | 20262-228072-01 | DOC DER | |
| February 11, 2026 | 20262-228063-01 | Xcel Energy | 2026-02-11 Lyon County_Comments on EA and Sample Permits |
| February 9, 2026 | 20262-227950-01 | PUC | Ian Hedberg |
| February 8, 2026 | 20262-227948-01 | PUC | Drew Harper |
| February 4, 2026 | 20262-227861-02 | Xcel Energy | Comments in Support of Certificate of Need |
| February 3, 2026 | 20262-227790-01 | PUC | Public Hearing Slides |
| January 14, 2026 | 20261-226916-01 | PUC | Notice of Comment Period on the Merits of the Certificate of Need Application |
| January 9, 2026 | 20261-226695-01 | PUC EIP | Environmental Assessment - Xcel Energy Lyon County Generating Station |
| January 9, 2026 | 20261-226668-01 | PUC | NOTICE OF PUBLIC HEARINGS AND AVAILABILITY OF ENVIRONMENTAL ASSESSMENT |
| November 24, 2025 | 202511-225235-01 | PUC | Sample Permits |
| October 30, 2025 | 202510-224450-01 | PUC EIP | Final Scoping Decision and Notice - Lyon County Generating Station Project |
| October 28, 2025 | 202510-224353-01 | PUC | |
| October 23, 2025 | 202510-224231-01 | PUC | Consent |
| October 23, 2025 | 202510-224208-01 | PUC | Proposed Consent Items |
| October 2, 2025 | 202510-223500-01 | PUC EIP | Xcel Energy letter describing project revisions |
| September 29, 2025 | 20259-223391-01 | PUC EIP | Applicant email regarding change in evaporative cooling - posted after close of the public comment period. |
| September 16, 2025 | 20259-223053-01 | CAH | Prehearing Order |
| September 5, 2025 | 20259-222751-01 | PUC EIP | PUC EIP Scoping Letter - Scoping Summary and Recommendation |
| August 29, 2025 | 20258-222600-01 | PUC EIP | Lyon County Comments on Ditch and Drainage - Filed August 12, 2025 |