Lyon County Generating Station Project

Project Details

Docket Numbers
Project Name
Lyon County Generating Station Project
Applicant
Northern States Power DBA Xcel Energy
Location
Lyon County
Description

Northern States Power Company, a Minnesota corporation doing business as Xcel Energy, has submitted a Combined Application to the Minnesota Public Utilities Commission (Commission) for the proposed Lyon County Generating Station Project. This application seeks multiple approvals, including a Certificate of Need, Site Permit, Transmission Line Route Permit, and Pipeline Routing Permit, as well as a Partial Exemption for routing the pipeline.
 

Status
active

Project Contact

Contact
James E. Sullivan
Phone

Project Summary

The Project includes three major components:

  1. Generation Project: This involves the construction and operation of two combustion turbines (CTs), each with a capacity of approximately 210 megawatts (MW). These turbines will be located on-site with supporting infrastructure such as operation facilities, a water bath heater, emergency diesel fire pump, and diesel backup generators. Together, they form the Generation Project, which requires a Certificate of Need and a Site Permit.
     
  2. Transmission Lines: The project includes two short transmission line connections that will link the generation site to the regional grid. These lines are essential to transfer electricity from the turbines to the broader network. Approval is sought under the Commission’s alternative permitting process for these lines.
     
  3. Natural Gas Pipeline: A key component of the project is a 965-foot natural gas pipeline. This pipeline includes approximately 700 feet of 12-inch diameter pipe and two branches of 8-inch pipe, each connecting to a combustion turbine. It will operate at around 550 psig and connect to an existing Applicant gas line. Due to its limited scale and potential impact, Xcel Energy is requesting a partial exemption from the standard pipeline routing procedures as per Minnesota Rules Chapter 7852.0700.

These elements together constitute the full Lyon County Generating Station Project. The entire facility will be located on two parcels in Lyon County, Minnesota, adjacent to the proposed Garvin Substation. The site was chosen to align with the southern terminus of the Minnesota Energy Connection Project (MNEC), an infrastructure initiative featuring a 345-kilovolt (kV), 180-mile double-circuit transmission line connecting the Sherburne County Generation Station Substation in Becker to the Garvin Substation. The Project’s successful operation is dependent on the completion and energization of the MNEC.

The Project footprint covers about 155 acres, but permanent development and environmental impact will be limited to approximately 30 acres. Xcel Energy will own the parcels on which the Project will be constructed, ensuring control over land use and compliance with operational and environmental standards. The proposal aligns with ongoing energy transition efforts and broader state planning for future electrical grid needs. od.

Interactive Map

Key Project Documents

Date Title Description
May 9, 2025 Lyon County Generation Project - Combined Application Northern States Power Company, a Minnesota corporation doing business as Xcel Energy, has submitted a Combined Application to the Minnesota Public Utilities Commission (Commission) for the proposed Lyon County Generating Station Project. This application seeks multiple approvals, including a Certificate of Need, Site Permit, Transmission Line Route Permit, and Pipeline Routing Permit, as well as a Partial Exemption for routing the pipeline.

Docket Documents

View All Project Documents 

Date Title On Behalf Of Description
August 12, 2025 20258-222217-01 PUC Lyon County
July 31, 2025 20257-221587-01 PUC NOTICE OF PUBLIC INFORMATION AND ENVIRONMENTAL ASSESSMENT SCOPING MEETINGS
July 16, 2025 20257-221037-01 PUC May 8, 2025 Agenda
July 14, 2025 20257-220915-01 PUC
July 10, 2025 20257-220859-01 PUC Consent
July 10, 2025 20257-220829-01 PUC Proposed Consent Items
July 9, 2025 20257-220799-01 PUC Notice of Legislative Changes
July 1, 2025 20257-220582-02 Xcel Energy Updated Sales and Demand Forecast
June 23, 2025 20256-220149-01 Xcel Energy Xcel_Lyon County_Filing Letter Notice Compliance
June 18, 2025 20256-220002-01 OAG-RUD
June 18, 2025 20256-219986-01 DOC DER
June 13, 2025 20256-219889-02 Xcel Energy Attachment B
June 13, 2025 20256-219889-01 Xcel Energy
June 6, 2025 20256-219697-02 DOC DER Attachment 1
June 6, 2025 20256-219697-01 DOC DER
June 6, 2025 20256-219700-01 DOC EERA EERA Application Completeness Review June 6, 2025
May 14, 2025 20255-218960-01 PUC
May 13, 2025 20255-218860-01 PUC NOTICE OF COMMENT PERIOD ON APPLICATION COMPLETENESS
May 9, 2025 20255-218750-01 Xcel Energy Xcel _Lyon County_Summary of Certificate of Need Filing
May 9, 2025 20255-218749-15 Xcel Energy Appendix L_Load Forecast and Conservation Programs
May 9, 2025 20255-218749-12 Xcel Energy Appendix J - Agency, Tribal, and Public Correspondence
May 9, 2025 20255-218749-13 Xcel Energy Appendix K - Operational and Cost Detail - PUBLIC
May 9, 2025 20255-218749-10 Xcel Energy Appendix H - Wetland Delineation and Protected Species Assessment Report
May 9, 2025 20255-218749-08 Xcel Energy Appendix F - Calculated Magnetic Flux Density for 345-kV Lines
May 9, 2025 20255-218749-06 Xcel Energy Appendix D - Typical Transmission Line Structure Design
May 9, 2025 20255-218749-07 Xcel Energy Appendix E - Material Safety Data Sheets
May 9, 2025 20255-218749-04 Xcel Energy Appendix B - Notice of Intent to File Site and Route Permit Application
May 9, 2025 20255-218749-01 Xcel Energy 2025-05-09 Xcel_Filing Letter_Combined Application Filing
May 9, 2025 20255-218749-11 Xcel Energy Appendix I - Sound Study Report
May 9, 2025 20255-218749-09 Xcel Energy Appendix G - Phase I Cultural Resource Report