Description

Regal Solar, LLC was granted a site permit to construct the 100 MW Regal Solar Project in Benton County.

Status
active

Project Contact

Contact
Tessa Kothlow
Phone

Project Summary

Regal Solar, LLC (a wholly owned subsidiary of Geronimo Energy, LLC) was granted a site permit to construct the Regal Solar Project—a 100 MW solar energy generating system in Benton County. Its primary components include photovoltaic panels affixed to a linear ground-mounted single-axis tracking system, inverters and transformers housed in electrical cabinets, 3.3 mile double-circuit above-ground electrical collection system, project substation, and SCADA systems and metering equipment. The project also requires fencing, access roads, laydown areas, two weather stations, and an operation and maintenance facility. It would interconnect to the electrical grid at a new Minnesota Power switching station through a new, 700-foot 115 kV gen-tie transmission line.

The proposed project is directly west of U.S. Highway 10, approximately 230 feet west of Rice and one and one-half miles southeast of Royalton. It is located entirely in Langola Township on approximately 800 acres of center pivot irrigated farmland, which is not designated as prime farmland. The applicant maintains a purchase option with a single landowner.

Interactive Map

Map Image

To view a static project location map, click the map below. More detailed maps can be found in the addendum.

Key Project Documents

Date Title Description
April 26, 2021 Site Permit for the Regal Solar Project The Public Utilities Commission issued a site permit for the Regal Solar Project.
November 9, 2020 Environmental Assessment for the Regal Solar Project The environmental assessment (EA) for the Regal Solar Project. The EA evaluates the potential human and environmental impacts of the project and possible mitigation measures. The EA will be used by the Public Utilities Commission in making decisions on the certificate of need and site permit for the project.
August 11, 2020 Addendum to Revised Site Permit Application On August 4, 2020, Regal Solar, LLC, submitted an addendum to its revised site permit application that describes project changes concerning the electrical interconnection point.
October 9, 2019 Revised Site Permit Application The revised site permit application submitted by Regal Solar, LLC, to the Public Utilities Commission for the Regal Solar Project.