Alexandria to Big Oaks 345 kV Transmission Line Project

Project Details

Docket Numbers
Project Name
Alexandria to Big Oaks 345 kV Transmission Line Project
Applicant
Xcel Energy (Northern States Power Company, doing business as Xcel Energy, along with Great River Energy, Minnesota Power, Otter Tail Power Company, and Missouri River Energy Services, on behalf of Western Minnesota Municipal Power Agency)
Location
Description

Xcel Energy proposes to string approximately 105-108 miles of new transmission line on existing double-circuit capable structures running from the existing Alexandria Substation in Alexandria, Minnesota to Becker, Minnesota, where new transmission lines would be needed to cross the Mississippi River and facilitate the new Big Oaks Substation.

Status
active

Project Contact

Contact
Jenna Ness
Phone

Project Summary

Xcel Energy proposes to string approximately 105-108 miles of new transmission line on existing double-circuit capable structures running from the existing Alexandria Substation in Alexandria, Douglas County to Becker, Sherburne County where new transmission lines would cross the Mississippi River to facilitate the proposed Big Oaks Substation. The project is needed to provide additional transmission capacity, mitigate current capacity issues, and improve electric system reliability.

The Alexandria to Big Oaks project is the East segment of the larger Big Stone (in South Dakota) – Alexandria – Big Oaks 345 kV transmission line project which has applied for a certificate of need (CN-22-538) as one. This project comprises the East segment from Alexandria to Big Oaks which filed for a separate route permit application than the West Big Stone – Alexandria segment.

Stringing the existing structures requires new poles in a few places, but mostly will not require new infrastructure. The majority of the proposed route covers existing transmission line right-of-way except for four locations which will require new right-of-way:

  1. The new 345 kV transmission line to tap into the existing Alexandria Substation;
  2. A reconfiguration of the existing 345 kV circuit from Alexandria to bypass the Riverview Substation near the city of Freeport;
  3. A bypass of the Quarry Substation near the city of Waite Park; and
  4. A new crossing over the Mississippi River to connect a new 345 kV transmission line near Monticello to the new Big Oaks Substation west of the Monticello Nuclear Generating Plant in Becker, Minnesota. Two options are being considered with the length ranging from 0.7 miles to 2.1 miles.

The cumulative length of the first three areas is less than one mile total.

Interactive Map

Key Project Documents

Date Title Description
October 31, 2024 PUC Decision on Route Permit On October 30, 2024, the Minnesota Public Utilities Commission issued an order that granted a route permit for the Alexandria to Big Oaks 345-kV Transmission Project.
October 31, 2024 Route Permit This file contains the route permit and conditions for the Alexandria to Big Oaks 345-kV Transmission Project.
July 11, 2024 EA Addendum An addendum to the EA was issued on June 10, 2024, to clarify information needed on the west segment of the project associated with the certificate of need, including required environmental report content.
May 29, 2024 Environmental Assessment The final environmental review document for the Alexandria to Big Oaks 345 kV Transmission Line project has been published.
October 9, 2023 Route Permit Application On September 29, 2023, the applicant filed a combined certificate of need and route permit application with the Minnesota Public Utilities Commission.
September 8, 2023 Certificate of Need Application On September 29, 2023, the applicant filed a certificate of need application for the entire project (Big Stone South to Alexandria to Big Oaks) with the Minnesota Public Utilities Commission.

Docket Documents

View All Project Documents 

Date Title On Behalf Of Description
December 18, 2024 202412-213161-01 PUC October 3, 2024 Minutes
November 27, 2024 202412-213214-01 PUC October 3, 2024 Minutes
November 15, 2024 202411-211993-01 PUC ERRATUM NOTICE
October 30, 2024 202410-211465-02 PUC ORDER GRANTING CERTIFICATE OF NEED AND ISSUING ROUTE PERMIT
October 30, 2024 202410-211465-08 PUC MAP 3 OF 3
October 30, 2024 202410-211465-04 PUC MAP 1 OF 3
October 30, 2024 202410-211465-06 PUC MAP 2 OF 3
September 26, 2024 20249-210489-02 PUC OCTOBER 3, 2024 AGENDA - REVISED
September 26, 2024 20249-210499-02 PUC OCTOBER 3, 2024 AGENDA - REVISED, WITH ATTACHMENTS
September 25, 2024 20249-210465-02 PUC OCTOBER 3, 2024 AGENDA
September 20, 2024 20249-210371-03 PUC OCTOBER 3, 2024 AGENDA MEETING
September 10, 2024 20249-210098-02 NORTHERN STATES POWER COMPANY, DBA XCEL ENERGY, GREAT RIVER ENERGY, MINNESOTA POWER, OTTER TAIL POWER COMPANY, AND MISSOURI RIVER ENERGY SERVICES, ON BEHALF OF WESTERN MINNESOTA MUNICIPAL POWER AGENCY APPLICANTS EXCEPTIONS TO ALJ REPORT
September 10, 2024 20249-210096-01 OTTER TAIL POWER COMPANY AND WESTERN MINNESOTA MUNICIPAL POWER AGENCY SEPTEMBER 2024 STATUS UPDATE
September 5, 2024 20249-209989-02 DOC EERA EXCEPTIONS TO THE ALJ REPORT
August 30, 2024 20248-209899-01 OAH FINDINGS OF FACT, CONCLUSIONS OF LAW, AND RECOMMENDATIONS
August 15, 2024 20248-209546-01 OAH
July 26, 2024 20247-209008-01 OTTER TAIL POWER COMPANY AND WESTERN MINNESOTA MUNICIPAL POWER AGENCY JULY 2024 STATUS UPDATE
July 25, 2024 20247-208987-01 DOC EERA EERA POST-HEARING AND REPLY COMMENTS
July 9, 2024 20247-208456-02 PUC CONSERVATIVE ENERGY FORUM
July 8, 2024 20247-208431-02 PUC DAVID BREY
July 8, 2024 20247-208395-02 CLEAN ENERGY ECONOMY MN (CEEM)
July 8, 2024 20247-208432-01 PUC JOSHUA BATTIS
July 8, 2024 20247-208375-01 IUOE LOCAL 49 AND NCSRC OF CARPENTERS
July 8, 2024 20247-208434-01 PUC WILBUR AND MARY HAMANN
July 8, 2024 20247-208401-02 NORTHERN STATES POWER COMPANY DOING BUSINESS AS XCEL ENERGY, GREAT RIVER ENERGY, MINNESOTA POWER, OTTR TAIL POWER COMPANY, AND WESTERN MINNESOTA POWER AGENCY COMMENTS ON ENVIRONMENTAL ASSESSMENT AND ADDENDUM
July 7, 2024 20247-208357-01 PUC ARLLYCE AND BRUCE ABRAHAMSON
June 27, 2024 20246-208012-01 OTTER TAIL POWER COMPANY BSSA PUBLIC HEARING COMPLIANCE
June 25, 2024 20246-208010-02 PUC MPCA
June 18, 2024 20246-207778-02 PUC VIOLA AND JOHN RIDGE
May 30, 2024 20247-208423-01 DOC EERA NOTIFICATION - EA PROVIDED TO PERMITTING AGENCIES