Plum Creek Wind Project Draft Environmental Impact Statement

Plum Creek Wind Project - Draft Environmental Impact Statement

Text, Tables and Diagrams

FIGURES

Figure 1 – Project Location (LWECS)

Figure 2 – Project Location (HVTL)

Figure 3a – Turbine Layout and Constraints (Vestas V162)

Figure 3b – Turbine Layout and Constraints (SG170)

Figure 4a – Zoning Map (Vestas V162)

Figure 4b – Zoning Map (SG170)

Figure 5a – Surface Waters (Vestas V162)

Figure 5b – Surface Waters (SG170)

Figure 6a – FEMA Floodplain (Vestas V162)

Figure 6b – FEMA Floodplain (SG170)

Figure 7a – Wetlands Inventory Map (Vestas V162)

Figure 7b – Wetlands Inventory Map (SG170)

Figure 8a – Land Cover (Vestas V162)

Figure 8b – Land Cover (SG170)

Figure 9a – Soils (Vestas V162)

Figure 9b – Soils (SG170)

Figure 10a – Unique Natural Features (Vestas V162)

Figure 10b – Unique Natural Features (SG170)

Figure 11 – Existing Wind Turbines

Figure 12a – Public Land Ownership and Recreation (Vestas V162)

Figure 12b – Public Land Ownership and Recreation (SG170)

Figure 13a – Microwave Beam Path (Vestas V162)

Figure 13b – Microwave Beam Path (SG170)

Figure 14 – Cottonwood River Alternative Alignment

Figure 15 – Land Cover Map (HVTL)

Figure 16 – Recreational Opportunities Map (HVTL)

Figure 17 – Water Resource Map (HVTL)

Figure 18 – Natural Resources Site Map (HVTL)

APPENDICES

A. EIS Scoping Decision

B. LWECS Draft Site Permit

C. HVTL Route Permit Template

D. Detailed HVTL Route Maps Plate 1

D. Detailed HVTL Route Maps Plate 2

D. Detailed HVTL Route Maps Plate 3

D. Detailed HVTL Route Maps Plate 4

E. Technical Specification-Diagrams – Transmission Project

F. Electric and Magnetic Fields Supplemental Paper