Revised Site Permit Application

The revised project would still be located in Vienna Township of Rock County. The primary
components of the facility would include photovoltaic panels affixed to a linear axis tracking rack system, inverters, step-up transformers, electrical cables and conduits, electrical cabinets, access roads, a 34.5/161- kilovolt (kV) step-up substation with metering and switching gear, security fencing, below-ground or above-ground electrical collection and communication lines, an operation and maintenance facility, parking lot, up to two weather stations, a 161 kV overhead transmission line (under 1,500 feet in length), a supervisory control and data acquisition system, and temporary laydown areas. The project would interconnect to the existing 161 kV Magnolia Substation adjacent to the project site.

Site Permit Application

Text

Figure 1 Project Location

Figure 2 2023 Land Control and Preliminary Development Areas

Figure 3 Preliminary Project Layout

Figures 4a Detailed Preliminary Project Layout

Figures 4b Detailed Preliminary Project Layout

Figures 4c Detailed Preliminary Project Layout

Figures 4d Detailed Preliminary Project Layout

Figures 4e Detailed Preliminary Project Layout

Figures 4f Detailed Preliminary Project Layout

Figures 4g Detailed Preliminary Project Layout

Figures 4h Detailed Preliminary Project Layout

Figures 4i Detailed Preliminary Project Layout

Figures 4j Detailed Preliminary Project Layout

Figures 4k Detailed Preliminary Project Layout

Figure 5 Potential Solar Development Constraints

Figure 6 Regional Prime Farmland

Figure 7 Recreation

Figure 8 Land Use

Figure 9 Existing Infrastructure and AADT

Figure 10 Farmland Classifications

Figure 11 Water Resources

Appendix A Agency Correspondence

Appendix B Site Plan (part 1)

Appendix B Site Plan (part 2)

Appendix B Site Plan (part 3)

Appendix B Site Plan (part 4)

Appendix B Site Plan (part 5)

Appendix B Site Plan (part 6)

Appendix C Agricultural Impact Mitigation Plan and Vegetation Management Plan (part 1)

Appendix C Agricultural Impact Mitigation Plan and Vegetation Management Plan (part 2)

Appendix D – Draft Decommissioning Plan

Appendix E Emissions Calculations