Route Permit Application -- Line 3 Pipeline Replacement Project

Line 3 Route Application

Cover (1.1 MB)

Table of Contents (730KB)

Executive Summary (6.6 MB)

Acronyms and Definitions (628 KB)

Ch. 1: Introduction (940 KB)

Ch. 2: Background Information (431 KB)

Ch. 3: Purpose and Need (194 KB)

Ch. 4: Project Description (590 KB)

Ch. 5 : Right-of-Way Preparationa and Construction Sequence (2.6 MB)

Ch. 6: Route Selection Process (2.9 MB)

Ch. 7: Environmental Impact of Preferred Route (5.5 MB)

Ch. 8: Permanent Removal of Existing Line from Service (329 KB)

Ch. 9: Public  and Stakeholder Outreach (2.2 MB)

Ch. 10: References (360 KB)

Appendices

Appendix A: Presidential Permit (2.1 MB)

Appendix B: Detailed Map Book (by county and Mile Post (MP) West to East). Each map "set" includes an aerial map and corresponding topographic map.

Project Overview Map (471 KB)

County Overview Maps (1.5 MB)

Kittson MP13W- MP27  (3.3 MB)

Marshall MP28W-MP62W (7.2 MB)

Pennington MP63W-MP81W (6.0 MB)

Polk MP99W-MP112W (3.3 MB)

Red Lake MP83W-MP98W (4.0)

Clearwater 1 MP113W-MP122W (3.9 MB)

Clearwater 2 MP1E-MP24E (9.9 MB)

Clearwater 3 MP25E-MP32E (4.7 MB)

Hubbard 1 MP33E-MP45E (6.2 MB)

Hubbard 2  MP465E-MP63E (8.1 MB)

Hubbard 3 MP64E-MP76E (4.7 MB)

Wadena MP77E-MP83E (3.4 MB)

Cass 1 MP84E-105E (5.8 MB)

Cass 2 MP111E-MP136E (9.1 MB)

Crow Wing MP106-MP110E (4.0 MB)

Aitkin 1 MP137E-MP148E (6.8)

Aitkin 2 MP149-MP176E (8.5)

Aitkin 3 MP177E-MP187E (2.8)

Carlton 1 MP188-MP205E (4.6 MB)

Carlton 2 MP206E-MP187E (2.8)

Appendix C: Pumping Station Plot Plans (1.4 MB)

Appendix D: Pipeline Safety Report (1.1 MB)

Appendix E: Environmental Protection Plan (5.7 MB)

Appendix F: Material Safety Data Sheets (2.5 MB)

Appendix G: Right-of-Way Configuration Drawings (794 KB)

Appendix H: Agricultural Protection Plan (1.0 MB)

Appendix I: Trench Installation Typicals (485 KB)

Appendix J: Agency Consultation 1 of 3  (8.6 MB)

Appendix J: Agency Consultation 2 of 3 (8.7 MB)

Appendix J: Agency Consultation 3 of 3 (5.0 MB)

Appendix K: Response to Comment Letters (4.9 MB)

Appendix L: Number of Roads Crossed (686 KB)

Appendix M: Noise Impact Analysis (2.3 MB)

Appendix N: Construction and Operational Impacts (894 KB)

Appendix O: Waterbodies Crossed (675 KB)

Appendix P: Unanticipated Discoveries Plan (791 KB)

Appendix Q: Public Outreach  Materials (8.2 MB)