| Title | Docket No | Description |
|---|---|---|
| Lyon County Generating Station Project | 25-145 | Northern States Power Company, a Minnesota corporation doing business as Xcel Energy, has submitted a Combined Application to the Minnesota Public Utilities Commission (Commission) for the proposed Lyon County Generating Station Project. This application seeks multiple approvals, including a Certificate of Need, Site Permit, Transmission Line Route Permit, and Pipeline Routing Permit, as well as a Partial Exemption for routing the pipeline. |
| Dooley's Renewable Natural Gas Pipeline | 23-392 | Dooley's Natural Gas II, LLC (Dooley's) is proposing to construct approximately 28 miles of 4-inch and 2-inch pipeline in Chippewa, Swift, and Kandiyohi Counties |
| Pipestone Pipeline Reroute Project | 23-109 | The Magellan Pipeline Company proposes to relocate approximately 0.74 miles of an existing petroleum pipeline in Pipestone County. |
| Heartland Corn Products Natural Gas Pipeline Project | 23-43 | Heartland Corn Products proposes to construct an approximately 7.78-mile long, 6.625-inch outside diameter natural gas pipeline in Sibley County, Minnesota. The pipeline will originate near 595th Avenue, north of Highway MN- 19 (west of the City of Winthrop) and tie into the Hutchinson Utilities Commission pipeline at a new interconnect station. |
| Otter Tail to Wilkin Carbon Dioxide Pipeline Project | 22-422 | Summit Carbon Solutions, LLC, proposes to construct about 30 miles of carbon dioxide pipeline through Otter Tail and Wilkin Counties. |
| Rochester Airport Pipeline Relocation Project | 21-266 | BP Midwest Product Pipelines Holding, LLC (BPMW) is proposing to reroute a section of pipeline near the Rochester International Airport in Olmsted County, Minnesota. |
| Pine Bend Pipeline Project | 20-872 | Petroleum Fuels Company (PFC) is proposing to construct a 5,600 foot long natural gas pipeline in Dakota County. The pipeline will transport natural gas from a processing facility near the Pine Bend landfill to an interconnection with the Northern States Power gas system. |
| Enbridge Energy, Limited Partnership: Fond du Lac Line 4 Project | 18-752 | Enbridge Energy, Limited Partnership has applied for a Pipeline Route Permit and Partial Exemption for the Fond du Lac Line 4 Project on the Fond du Lac Band of Lake Superior Chippewa Reservation. The Project will relocate approximately 10 miles of the existing Line 4 pipeline from the center to the outer edge of the existing Enbridge Mainline Corridor within the Fond du Lac Band Reservation. |
| Rochester Natural Gas Pipeline Project | 15-858 | Minnesota Energy Resources Corporation is proposing to install approximately 13.1 miles of new natural gas pipeline west and south of the city of Rochester in Olmsted County, Minnesota |
| Line 3 Pipeline Replacement | 15-137 | Enbridge Energy proposes to replace 337 miles of the Line 3 Pipeline in Minnesota. Line 3 originates in Canada, continues through North Dakota, enters Minnesota in Kittson County, and terminates in Superior, Wiscsonsin. |