Projects
| Title | Docket No | Description Sort descending |
|---|---|---|
| Maple Grove 115 kV Transmission Line Project | 24-427 | Application for a 2 mile 115 kV double-circuit high voltage transmission line (HVTL) in the City of Maple Grove, Hennepin County, Minnesota. |
| Benton Granite City BESS Project | 26-248 | Benton Granite City Energy Storage, LLC (applicant), a wholly owned, indirect subsidiary of NextEra Energy Resources, LLC (NEER), filed a site permit application to construct and operate the Granite City BESS Project (project), an up to 300 megawatt (MW) BESS and associated facilities in the St. Cloud-Minden Township Orderly Annexation Area (OAA) in Benton County, Minnesota. |
| Mayhew Lake Energy Storage System | 26-112 | A battery energy storage system with a nominal power rating of up to 100 MW alternating current with approximately 400 megawatt-hours of energy capacity on a site consisting of approximately 37 acres adjacent to the Northern States Power Mayhew Lake Substation in Sauk Rapids Township, Benton County, Minnesota |
| Big Bend/GRE Transmission Line Extension | 25-389 | Big Bend Wind, LLC and Great River Energy propose to construct approximately 4.5 miles of 161 kV transmission line to connect the Big Bend wind project to the Great River Energy’s Lakefield Junction Station in Martin County, Minnesota. |
| Castle Rock Battery Energy Storage System Project | 25-430 | Castle Rock Solar LLC proposes to construct and operate the Castle Rock BESS project, a battery energy storage system (BESS) and associated facilities in Castle Rock Township, Dakota County, Minnesota. |
| Coneflower 345 kV Transmission Line Project | 26-132 | Coneflower Energy, LLC, is proposing to construct a short 345 kV high voltage transmission line in Lyon County, Minnesota |
| Otto Tap 115 kV Transmission Project | 25-269 | Great River Energy and Lake Region Electric Cooperative propose to build a new 2.9-mile 115-kilovolt single-circuit high voltage transmission line and a new Otto Substation in Otter Tail County, Minnesota. |
| Mankato Battery Energy Storage Project | 26-158 | Mankato Energy Center, LLC (Applicant), a wholly owned subsidiary of Onward Energy Holdings, LLC, proposes to construct a batter energy storage system (BESS) and associated facilities (Project), in Blue Earth County, Minnesota. |
| Bison to Alexandria Second Circuit 345 kV Transmission Line Project | 25-116 | Northern States Power Company, doing business as Xcel Energy, along with Great River Energy, Minnesota Power, Otter Tail Power Company, and Missouri River Energy Services on behalf of Western Minnesota Municipal Power Agency propose to construct a new 345 kV transmission circuit on mostly existing transmission line structures from the existing Bison Substation near Fargo, North Dakota to the existing Alexandria Substation in Alexandria, Minnesota. The existing 345 kV structures were previously permitted and constructed as double-circuit capable as part of the Fargo – St. Cloud 345 kV Transmission Project. |
| Skyway 345 kV Transmission Line Project | 26-135 | The applicant proposes to construct and operate a 1.2 mile 345 kV double-circuit high voltage transmission line in Goodhue County, Minnesota. |
| Sherco Solar 4 | 26-213 | Xcel Energy proposes to construct and operate the Sherco Solar 4 Project, an up to 200 megawatt (MW) solar energy generating system and approximately 2.7 miles of single-circuit transmission line in Sherburne County. |
| Plummer Solar Project | 22-451 | Enbridge Solar (Plummer), LLC is proposing to construct an up to 130 MW solar energy generating system located in Emardville Township in Red Lake County, Minnesota. |
| Brookings County - Hampton Transmission Line Project | 08-1474 | A 237-mile 345 kilovolt (kV) transmission line and associated facilities running from Brookings County, South Dakota, to Hampton, Minnesota. The project began operation in 2015. |
| Hoot Lake Battery Energy Storage System Project | 26-313 | A battery energy storage system with a nominal power rating of up to 125-megawatt (MW) alternating current with approximately 500 megawatt-hours (MWh) of energy capacity, and a 2,874-foot long 115 kV high voltage transmission line (HVTL) on a site consisting of 68 acres on land owned by Otter Tail Power in Fergus Falls, Otter Tail County, Minnesota. |
| Gopher to Badger Link | 25-121 | A Certificate of Need Application has been filed by Xcel Energy and Dairyland Power Cooperative for the proposed Gopher to Badger Link Project. The Gopher to Badger Link Project would involve constructing two new 765-kV high-voltage electric transmission lines across Minnesota as part of a broader proposed regional transmission network connecting Minnesota, South Dakota, Iowa, and Wisconsin. |
| Benton Solar Project | 23-423 | Benton Solar, LLC proposes to construct a 100 megawatt (MW) solar energy generating facility, a 100 MW battery energy storage system, and a 0.4 mile long, 115 kilovolt high voltage transmission line within Minden Township, Benton County, Minnesota. |
| Big Bend Wind 161 kV Transmission Line | 19-621 | Big Bend Wind, LLC has proposed the construction and operation of an 18 mile long 161 kilovolt (kV) high voltage transmission line (HVTL) to be located in Cottonwood, Martin, and Watonwan Counties, Minnesota. The proposed 161 kV HVTL is proposed to begin at the Big Bend Wind Project substation, and extend 18 miles to a proposed step-up substation to be located less than 1,500 feet of the Crandell Switching Station. |
| Big Bend Wind Project | 19-619 | Big Bend Wind, LLC, a subsidiary of Apex Clean Energy, Inc., is proposing the Big Bend Wind Project located within portions of Cottonwood and Watonwan counties, Minnesota. The Big Bend Wind Project is proposing to constructed and operate 47 Nordex N-163 (5.7 MW), 48 Vestas V162 (5.6 MW), or 49 GE-158 (5.5 MW) turbines, which will have a total generation capability of up to 308 megawatts (MWs). \r\n\r\n |
| Birch Coulee Solar Project | 23-477 | Birch Coulee Solar, LLC is proposing to construct an up to 125-megawatt photovoltaic solar energy generating facility in Renville County, Minnesota. |
| Blazing Star 2 Wind Project | 17-700 | Blazing Star 2 Wind Project is a 200 MW LWECS planned for construction in Lincoln County |
| Rochester Airport Pipeline Relocation Project | 21-266 | BP Midwest Product Pipelines Holding, LLC (BPMW) is proposing to reroute a section of pipeline near the Rochester International Airport in Olmsted County, Minnesota. |
| Byron Solar Project | 20-763 | Byron Solar, LLC is proposing to build a 200 MW solar project in Dodge County Minnesota. The Byron Solar Project would connect to the electrical grid via approximately three to four and one-half miles of newly constructed 345 kV transmission line. |
| Castle Rock Solar Project | 24-267 | Castle Rock Solar, LLC is proposing to construct an up to 150-megawatt solar energy generating facility in Dakota County, Minnesota. |
| Coneflower Solar Project | 24-215 | Coneflower Energy, LLC is proposing to construct an up to 235-megawatt solar energy generating facility in Lyon County, Minnesota. |
| Crane and Sandhill Battery Energy Storage Projects | 24-406 | Crane Energy Storage LLC and Sandhill Energy Storage LLC propose to construct and operate two 200 MW/800 MWh battery energy storage systems (BESS) and ancillary support infrastructure in Olmsted County, Minnesota. |
| Beaver Creek Transmission Line Project | 24-95 | Dairyland Power Cooperative (Dairyland) is proposing to construct an approximately 3.5 mile 161 kilovolt (kV) high voltage transmission line and associated facilities on a new right-of-way in York Township in Fillmore County, Minnesota. |
| Wabasha 161 kV Relocation Project | 23-388 | Dairyland Power Cooperative has submitted a joint Certificate of Need and Route Permit Application to the Minnesota Public Utilities Commission to relocate approximately 13.3 miles of 161-kilovolt (kV) high voltage transmission line (HVTL) and construct a new substation in Wabasha County, Minnesota. |
| Dodge County Wind 161 kV Transmission Line | 20-867 | Dodge County Wind proposes to construct approximately 27 miles of 161 kV transmission line in Dodge and Mower counties in Minnesota. |
| Dodge County Wind Project | 20-866 | Dodge County Wind, LLC (DCW or applicant), a subsidiary of NextEra Energy Resources, LLC, proposes to construct and operate a 259-megawatt (MW) wind farm in Dodge and Steele Counties and an associated 161 kV transmission line in Dodge and Mower counties. |
| Dooley's Renewable Natural Gas Pipeline | 23-392 | Dooley's Natural Gas II, LLC (Dooley's) is proposing to construct approximately 28 miles of 4-inch and 2-inch pipeline in Chippewa, Swift, and Kandiyohi Counties |
| Line 3 Pipeline Replacement | 15-137 | Enbridge Energy proposes to replace 337 miles of the Line 3 Pipeline in Minnesota. Line 3 originates in Canada, continues through North Dakota, enters Minnesota in Kittson County, and terminates in Superior, Wiscsonsin. |
| Enbridge Energy, Limited Partnership: Fond du Lac Line 4 Project | 18-752 | Enbridge Energy, Limited Partnership has applied for a Pipeline Route Permit and Partial Exemption for the Fond du Lac Line 4 Project on the Fond du Lac Band of Lake Superior Chippewa Reservation. The Project will relocate approximately 10 miles of the existing Line 4 pipeline from the center to the outer edge of the existing Enbridge Mainline Corridor within the Fond du Lac Band Reservation. |
| Freeborn Wind Farm | 17-410 | Freeborn Wind Energy, LLC, an affiliate of Invenergy, LLC, has proposed to construct and operate the 200 MW Freeborn Wind Farm in Freeborn County, Minnesota and Worth County, Iowa |
| Gopher State BESS Project | 26-235 | Gopher State Firm Power, LLC proposes to construct and operate a 200 megawatt (MW) energy storage facility and associated infrastructure, Kingman Township in Renville County, Minnesota |
| Gopher State Solar | 24-106 | Gopher State Solar, LLC is proposing to construct a new 200 mW solar energy generating facility in Renville County, Minnesota. |
| Kimball Substation and 115 kV Transmission Line Project | 26-182 | Great River Energy (GRE) and Meeker Energy propose to construct and operate a new 4-mile long 115 kV overhead single circuit transmission line starting at the proposed new switch structure to be constructed at the southeast corner of 140th Street (Meeker-Stearns Street) and 138th Avenue along the existing GRE 115 kV ME-BW transmission line and ending at the proposed Kimball Substation parcel. |
| Heartland Lakes 115 Kilovolt Transmission Line and Substation Project | 26-181 | Great River Energy and Itasca-Mantrap Electric Cooperative propose to construct and operate approximately 4.3 miles of new 115 kV transmission line and a new Heartland Lakes Substation in Hubbard County |
| Laketown 115 kV Transmission Line Project | 24-132 | Great River Energy proposes to construct a new 4.3 mile long 115 kV transmission line in Laketown and Dahlgren Townships in Carver County. |
| Cedar Lake 115 kV HVTL Reroute Project | 23-170 | Great River Energy proposes to construct a new 6.3 mile long 115 kV transmission line in Rice County and Scott County. |
| Hayward Solar Project | 21-113 | Hayward Solar, LLC is proposing to build and operate a 150 MW solar farm in Freeborn County. |
| Heartland Corn Products Natural Gas Pipeline Project | 23-43 | Heartland Corn Products proposes to construct an approximately 7.78-mile long, 6.625-inch outside diameter natural gas pipeline in Sibley County, Minnesota. The pipeline will originate near 595th Avenue, north of Highway MN- 19 (west of the City of Winthrop) and tie into the Hutchinson Utilities Commission pipeline at a new interconnect station. |
| Elm Creek II Wind Project | 09-553 | Heartland Wind, LLC, LWECS Site Permit Application for a 150 MW Wind Farm in Jackson and Martin Counties |
| Iron Pine Solar Project | 23-414 | Iron Pine Solar Power, LLC is proposing an up to 325-megawatt photovoltaic solar energy generating system and a 230-kilovolt high voltage transmission line in Kettle River Township, Pine County, Minnesota. |
| Lake Charlotte Solar Project | 25-205 | Lake Charlotte, LLC proposes to construct the 150 MW Lake Charlotte Solar Facility and 150 MW / 600-megawatt hour (MWh) Battery Energy Storage System (BESS) in Rutland Township, Martin County, Minnesota. |
| Lake Wilson Solar Energy Center | 21-792 | Lake Wilson Solar Energy proposes to construct and operate Lake Wilson Solar Energy Center, an up to 150 megawatt alternating current photovoltaic solar energy generating facility with 95 megawatts of battery storage in Leeds Township, Murray County, Minnesota. |
| Lemon Hill Solar Project | 25-126 | Lemon Hill Solar, LLC is proposing to construct an up to 180-megawatt solar energy generating facility in Olmsted County, Minnesota. |
| Cottage Grove BESS | 26-184 | LSP CG Storage, LLC proposes to construct and operate the Cottage Grove BESS project, a battery energy storage system (BESS) and associated facilities Cottage Grove, Washington County, Minnesota |
| Midwater Energy Storage Project | 24-294 | Midwater BESS, LLC, a subsidiary of Spearmint Renewable Development Company, LLC, plans to build and operate a 150-megawatt battery energy storage system (BESS) and a 2,668-foot long 161 kV high voltage transmission line (HVTL) in Shell Rock Township, Freeborn County, Minnesota. The project, called the Midwater Energy Storage Project, will interconnect the BESS to the grid. Construction is expected to start in the first quarter of 2027, with commercial operations set for the end of 2027. |
| Rochester Natural Gas Pipeline Project | 15-858 | Minnesota Energy Resources Corporation is proposing to install approximately 13.1 miles of new natural gas pipeline west and south of the city of Rochester in Olmsted County, Minnesota |
| Iron Range St. Louis County Arrowhead Transmission Line Project | 25-112 | Minnesota Power and American Transmission Company, LLC propose to construct approximately 67.5 miles of transmission line from Minnesota Power's Iron Range Substation near Grand Rapids, Minnesota to Minnesota Power's St. Louis County Substation near Hermantown, Minnesota, with a connection to American Transmission Company's nearby Arrowhead Substation along portions of Itasca and St. Louis Counties. The route proposed is located along, and in some cases replaces, existing high-voltage transmission lines for 92 percent of its length. New transmission lines will be required to connect the existing substations in Grand Rapids and Hermantown. Existing substations would also require expansions. |